A MTO company is in the process of implementing lean manufacturing techniques, making equipment layout changes and standardizing the designs of their highest value product in order to transition to ATO, which of the following actions should also be taken to reduce the backlog from 6 to 3 weeks?

A
Work OT until the backlog has been reduced to 3 weeks
B
Don't take orders for the ATO products for 3 weeks
C
Gradually reduce the marketing's quoted lead time to 3 weeks
D
No action is require since the backlog will reduce automatically

答案解析

正确答案:C

解析:

Work OT does not fulfill the lean manufacturing principles
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Sales and operations planning in a make-to-stock environment is concerned with projecting

单选题

Production is being planned to emphasize the utilization of a critical and very expensive
piece of capital equipment. Which of the following production planning strategies should be
used?

单选题

In an assemble-to-order environment, which of the following indicators is most appropriate
for measuring the effectiveness of the master scheduling process?

单选题

If the master production schedule is overstated, which of the following short-term actions is most appropriate?

单选题

In a capacity-constrained situation, which of the following actions is best to take if marketing wants to increase production of a master schedule item?

单选题

Which of the following statements is true about items that appear on a final assembly schedule?

单选题

Translation of a master production schedule directly into key resources results in a:

单选题

The question below is based on the following information: Which of the following weekly production rates best supports these criteria?
In a repetitive manufacturing environment where a level production rate must be maintained, the following customer backlog must be satisfied with NO late shipment;
Week Customer backlog qty
1 78
2 68
3 90
4 58
5 56

单选题

Rough-cut capacity planning is best used to:

单选题

In an assemble-to-order environment, which of the following factors is most significant in determining which items should be master scheduled?

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码