单选题

Stockouts have occurred to failures by suppliers to ship on schedule, causing extensive backorders. The past due orders were successfully reduced due to overtime once the parts arrived. The best approach for incorporating this information into the sales and operations planning process for the upcoming month is to

A
Increase the demonstrated capacity in the first period to reflect the use of overtime
B
Maintain the existing approach for developing the production and operational plans
C
Reduce the forecast demand in the first period and replace it the remaining past due orders
D
Reduce the production plan in the first period to free up capacity for the past due orders

答案解析

正确答案:B

解析:

The plan is still valid as the problem existed due to a supplier issue; The production plan should not be reduced due to supplier problem;
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

The primary outputs of the pre-sales and operations planning (S&OP) meeting are:

单选题

Which of the following functional objectives of a distribution system is most consistent with lower inventories?

单选题

During which of the following process steps of sales and operations planning would resource planning be carried out?

单选题

Which of the following considerations is most important when selecting forecasting software?

单选题

A firm manufactures four product families in a single facility using one production line for each product family. It has selected the hybrid approach to production planning and has specified that there will be no more than four changes in production rates per production line in a year. Resource planning will have to be performed for:

单选题

Which of the following items is required for making realistic customer promises?

单选题

Which of the following criteria is used to determine safety stock in a distribution center?

单选题

Which of the following costs is most likely to decrease when the number of warehouses in a distribution network increases?

单选题

The question below is based on the distribution center requirements shown below: How many units of product X should be planned to satisfy the demand for period 6?
Lead time=2 periods
Lot size=20
SS=20
PD Period
1 2 3 4 5 6
Forecast 40 10 30 60 50 80
PAB 50 30 20 30 30
Planned receipt 20 0 40 60
Planned orders 40 60

单选题

A single-level, centralized distribution network would be most appropriate for a firm whose products are:

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码