The best reason to use standard hours in a production plan for an ETO company is
答案解析
相关题目
A chemical plant refines crude oil from a nearby oil field into a few bulk chemicals that are stored on-site. The master planning of resources processes in this situation would most appropriately focus on:
Which of the following factors typically has the largest effect on the schedule developed by an advanced production scheduling (APS) system?
A large general hospital considers implementing a Sales and Operations Planning (S&OP) process to improve utilization of its surgical resources. The S&OP process:
An intensive distribution channel strategy would be most appropriate for which of the following types of product?
The primary objective of distribution network design is to balance total distribution cost with which of the following factors?
Which of the following techniques typically uses the bills of material for master schedule items in determining the capacity required?
A forecasting method that responds slowly to changes in demand would be most appropriate when the historical demand pattern shows a major:
Sales and Operation Planning's (S&OP) primary objective is:
Which of the following factors should be considered when evaluating a master production schedule change?
Which of the following is typically an output of the master scheduling process?