相关题目
Which manufacturing environment is the most economical production approach, with long runs, high capacity utilization rates and few set ups?
If a smoothing constant is 0.1, the old forecast was 150, and the actual demand was 170, what is the forecast for the next period?
A company produces some of its 20 top sellers everyday, and has a customer service policy of 99.5%, with next day shipments for each order. What is the most likely reason for not carrying safety stock on their highest volume products?
Use of which two of the following techniques best supports the planning needs of an ATO manufacturer that produces a product with many options and whose order winner is delivery speed?
1. Safety lead time for finished goods
2. Safety stock of finished products
3. Safety stock for long lead time components
4. Planning bills that overplan options
Which production environment will most benefit from CTP functionality?
Which of the following products is most likely to be the simplest to develop a sales and operations plan for?
Long range forecasts typically use which of the following forecasting techniques?
Which of the following processes employs a finite scheduling model of a company's manufacturing system to determine when an item can be delivered?
The 1st step to be produced in the planning of the scheduling of goods and services is
A forecast technique used to define the relationship between two or more variables, used to predict one variable over another is
