An ATO environment using a mixed model production schedule has a bottleneck work center. The best RCCP approach for determining the feasibility of the MPS is to
A company produces desk clocks as a product family w/20 different end-items. The overall production plan has been set at 8000units a month. Which of the following actions should be master scheduler take to develop the MPS?
A problem with evaluating master scheduling and purchasing performance as they relate to each other is
A data element that can cause the most occurrences of inaccuracy in a master schedule for a particular product is
The best reason for using planning bills of material in master scheduling is
A company purchases almost 30% of its raw material directly form farmers, cutting out wholesaler and distributors. The allows the companies to
A MPS with too short a horizon will result in
An organization converting from a process-focused facility to work cells will most likely experience which of the following?
A manufacturer of large appliances uses paced production lines for each product family. The rate varies by product and labor levels are established to minimize the possibility of a line stoppage. Each product family is produced to a mixed-model schedule with lot sizes of one to ten. The best option for verifying feasibility of the MPS is
Which of the following is a process environment that most likely uses both a master schedule and a FAS?