Select the process performed in the Analyze section of the DMAIC process.

A
Identify possible problems
B
Tent hypotheses
C
Identify control subjects
D
Ascertain critical to quality characteristics

答案解析

正确答案:B
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

A company produces MTO product families that use common work centers configured in a functional layout. Ship date are specified by the customer. It is a stable product line in the maturity stage, but demand is erratic. The master scheduler has ongoing problems maintaining a balanced schedule due to randomly appearing overload conditions among the various work centers. A likely cause of the overload condition is

单选题

An ATO environment using a mixed model production schedule has a bottleneck work center. The best RCCP approach for determining the feasibility of the MPS is to

单选题

A company produces desk clocks as a product family w/20 different end-items. The overall production plan has been set at 8000units a month. Which of the following actions should be master scheduler take to develop the MPS?

单选题

A problem with evaluating master scheduling and purchasing performance as they relate to each other is

单选题

A data element that can cause the most occurrences of inaccuracy in a master schedule for a particular product is

单选题

The best reason for using planning bills of material in master scheduling is

单选题

A company purchases almost 30% of its raw material directly form farmers, cutting out wholesaler and distributors. The allows the companies to

单选题

A MPS with too short a horizon will result in

单选题

An organization converting from a process-focused facility to work cells will most likely experience which of the following?

单选题

A manufacturer of large appliances uses paced production lines for each product family. The rate varies by product and labor levels are established to minimize the possibility of a line stoppage. Each product family is produced to a mixed-model schedule with lot sizes of one to ten. The best option for verifying feasibility of the MPS is

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码