What capacity tools are NOT needed in a Repetitive Manufacturing environment?
I. Rough Cut Capacity Planning
II. Capacity Requirements Planning
III. Input Output Control
答案解析
解析:
Capacity Planning is used to make sure there is only enough load on the line as needed. Detailed Capacity Requirements Plan or Input Output control is not needed because in a flow environment only need to constrain to the MPS level or what the flow rate is.
相关题目
Under which of the following conditions is it most necessary to perform bottom-up replaning of an overloaded key work center?
MRP has overloaded a work center in a MTO company. The most easily adjusted factor is
Which of the following information is out of the machining department supervisor's direct control?
The volume/mix of throughput on which overhead absorption rates are established is
A problem of considering reducing rated capacity in order to allow for safety capacity is
Material produced as a residual of or incidental to the production process is a
Efficiency is defined as
An ATO company produces subassemblies based on actual customer orders, and stocks the most commonly sold configurations. Planning occurs on a weekly basis. Safety capacity would be used to
Which of the following information from MRP can be used to sequence production orders?
The relationship of all components at the same level in the BOM to be available at the same time is