相关题目
Time-phased load by operation for CRP is calculated using
Inputs to CRP from MRP include
In a company with somewhat erratic demand levels. Which of the following information is of most importance to the planner in the relationship between material and capacity planning?
Under which of the following conditions is it most necessary to perform bottom-up replaning of an overloaded key work center?
MRP has overloaded a work center in a MTO company. The most easily adjusted factor is
Which of the following information is out of the machining department supervisor's direct control?
The volume/mix of throughput on which overhead absorption rates are established is
A problem of considering reducing rated capacity in order to allow for safety capacity is
Material produced as a residual of or incidental to the production process is a
Efficiency is defined as
