What models would be used for simulation and modeling techniques in the Operations management Planning area?
I. Rough Cut Capacity Planning
II. Capacity requirements Planning
III. Input Output Control
答案解析
解析:
1. Rough Cut Capacity planning
2. Capacity Requirements Planning and input Output Control is not under Operation management planning, but is under operations management execution.
相关题目
The line balancing approach to capacity management would be most appropriate in which of the following production environments?
A company has limited resources in some work centers and bottlenecks that move around based on product mix. Salesmen must be notified of overloads so schedule changes can be made with the customers. Which of the following scheduling techniques should be considered by management?
Time-phased load by operation for CRP is calculated using
Inputs to CRP from MRP include
In a company with somewhat erratic demand levels. Which of the following information is of most importance to the planner in the relationship between material and capacity planning?
Under which of the following conditions is it most necessary to perform bottom-up replaning of an overloaded key work center?
MRP has overloaded a work center in a MTO company. The most easily adjusted factor is
Which of the following information is out of the machining department supervisor's direct control?
The volume/mix of throughput on which overhead absorption rates are established is
A problem of considering reducing rated capacity in order to allow for safety capacity is