Which of the following are reasons for maintaining safety stock in finished goods inventory?
I. It covers errors in forecast.
II. The MPS plan may not be achieved even if realistic.
III. The inventory will buffer production from sales variations.
答案解析
相关题目
Which of the following scheduling techniques is used in an ATO environment for customer order promising?
Which of the following actions invalidates acceptance sampling for purchased items?
Which of the following environments is most unlike the others from an operational perspective?
Records for a part dimension over time show it has a single mean and that values tend to cluster around the mean. This type of distribution is likely to be referred to as
Which of the following data collection points serves 2 purposes in a pull environment that has machining and assembly lines and receives material directly to point-of-use areas?
A downsized associated with linking corporate financial incentives to specific performance objectives is that
W/proper lot sizing, operation overlapping will
Standard activities producing differing results is an example of
Backward scheduling work center A
Move time between operations = 1 day
Wait time = 1 day
Due date is day 100
Operation Work center Operation time Queue time
10 A 2 5
20 B 4 3
30 C 2 1
A characteristic of a lean enterprise strategy is