Which of the following statements about supplier rating system is true?
答案解析
相关题目
Which of the following techniques encourage suppliers to adopt lean principles?
To detect when a work center output might vary from the plan, the planner should compare
The Kanban system is responsible not only for implementing the production schedule but also?
Which of the following cost systems rely on costs for a period for determining product cost?
The objective of performance measurements is to
A company operates in a pull environment with final assembly lines in synchronous mode. Subassemblies maintain buffers ranging from hours to days. A global production performance measurement is
A highly engineered product was introduced a few years ago, with standards defined, BOM and routing finalized and work centers set up to minimize material handling. Major improvements in cycle time have been made. The information that is most likely to need change is
Which of the following techniques relies on something other than brainstorming for problem identification?
A statistical control chart has displayed one reading below the mean but within the upper and lower control limits, the action should be to
A production facility is capable of producing 1000 units per shift. Planned capacity is 7.2 hours per 8 hours shift, one shift per day and 5 days per week. Customer demand is 800 units per day, what is the task time?
