相关题目
A likely reason for performing acceptance sampling on a supplier receipt of 1000 resistors is
Information outside of the closed-loop process between production planning and capacity planning for determining work center loading is
Which of the following characteristics are desirable in a system measuring overall plant productivity?
1. Visibility of multiple manufacturing resources
2. Identification of factors for improving throughput
3. Presentational of data in discounted dollars
4. Detailed analysis of labor variances
Executives in hopes of achieving strategic goals may
Which of the following statements about throughput time is correct?
Which of the following areas of push system documentation is reduced by a pull system during the process design phase?
A lot undergoing acceptance sampling inspection is most likely accepted because
Which of the following would be most difficult to overcome while implementing lean principles?
When measuring shop floor performance, which method will encourage not producing unwanted product?
A company using a pull environment is creating a flow line to improve throughput to meet customer demand. Which of the following date needs to be calculated to design the line?
