Sales has identified an opportunity to develop a new market for a product family and requested an increase in the production plan. Which of the following actions would be most appropriate in this situation?

A
The proposed change should be presented to top management for a decision
B
The production plans for other product families should be reduced
C
The sales and operations plan should be regenerated
D
The request should be rejected

答案解析

正确答案:A
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

A manufacturing system is characterized by the emergence of standard designs, price competition and the importance of process development. It is in which of the following stages of the life cycle?

单选题

Which of the following statements about inventory is true in an ETO environment

单选题

When buying capital equipment, the large payment is typically followed by a series of smaller receipts or inflows recognized as either additional revenue or

单选题

Improvement programs at a manufacturing company have increased efficiency 10% and utilization 5%, what is the effect on the theoretical capacity?

单选题

What issue is often overlooked when an organization eliminates a product line?

单选题

If a company changes to activity-based costing, which of the following traditional measures will be affected?
I. Direct labor costs
II. Profit before taxes and depreciation
III. Allocation of overhead cost
IV. Unit product cost

单选题

A company competes in an industry that serves other manufactures, their customer play a significant role in defining requirement and most products have a 7-10 year life. The most likely advantage a company in this industry would realize from having a fast product service design process is that it can:

单选题

Using phantom BOM will result in which of the following?

单选题

An error in the demand forecast trend over several years will have the greatest impact on which of the following processes?

单选题

A major difference between an APS system and a traditional planning system is that an APS system includes the use of

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码