APP下载
首页
>
外语语音
>
320机型英语考试题库
搜索
320机型英语考试题库
题目内容
(
单选题
)
How is the SELCAL CALL light reset?

A、By pressing the transmission key on the ACP.

B、By pressing the CLR pushbutton.

C、By pressing the RESET key on any ACP.

答案:C

320机型英语考试题库
How is the radar information transmitted from the weather radar transceiver to the DUs ?气象雷达接收到的雷达信息如何传送给DUs
https://www.shititong.cn/cha-kan/shiti/00051009-333f-b9c2-c0f1-a6c9d0d6c300.html
点击查看题目
When is the half speed monitor active ?
https://www.shititong.cn/cha-kan/shiti/00051009-3390-6a0f-c0f1-a6c9d0d6c300.html
点击查看题目
The water valve and the flush valve are monitored by :
https://www.shititong.cn/cha-kan/shiti/00051009-32f8-1729-c0f1-a6c9d0d6c300.html
点击查看题目
When the APU fire pb is released out ,what happens to the electrical generation?
https://www.shititong.cn/cha-kan/shiti/00051009-33bb-e6c8-c0f1-a6c9d0d6c300.html
点击查看题目
In flight, a class 2 failure has occurred. Now, we are on ground. Where is this failure displayed ?
https://www.shititong.cn/cha-kan/shiti/00051009-3344-9a63-c0f1-a6c9d0d6c300.html
点击查看题目
On ground, when does the vacuum generator start to operate ?
https://www.shititong.cn/cha-kan/shiti/00051009-32f4-25de-c0f1-a6c9d0d6c300.html
点击查看题目
The TCAS/ATC control panel controls :
https://www.shititong.cn/cha-kan/shiti/00051009-3328-a622-c0f1-a6c9d0d6c300.html
点击查看题目
In which of the following configurations is the whole galley network shed when an overload occurs ?
https://www.shititong.cn/cha-kan/shiti/00051009-33ad-b291-c0f1-a6c9d0d6c300.html
点击查看题目
The static inverter operates
https://www.shititong.cn/cha-kan/shiti/00051009-339c-b39a-c0f1-a6c9d0d6c300.html
点击查看题目
Below 400 feet, during an ILS approach,the LAND active mode:
https://www.shititong.cn/cha-kan/shiti/00051009-33d0-b080-c0f1-a6c9d0d6c300.html
点击查看题目
首页
>
外语语音
>
320机型英语考试题库
题目内容
(
单选题
)
手机预览
320机型英语考试题库

How is the SELCAL CALL light reset?

A、By pressing the transmission key on the ACP.

B、By pressing the CLR pushbutton.

C、By pressing the RESET key on any ACP.

答案:C

分享
320机型英语考试题库
相关题目
How is the radar information transmitted from the weather radar transceiver to the DUs ?气象雷达接收到的雷达信息如何传送给DUs

A. On ARINC 429 and ARINC 453 buses

B. On Master DSEL and ARINC 453 buses

C. On ARINC 453 and Digital buses

https://www.shititong.cn/cha-kan/shiti/00051009-333f-b9c2-c0f1-a6c9d0d6c300.html
点击查看答案
When is the half speed monitor active ?

A. As soonas a directional valve is energized.

B. When the control valve is in full speed position.

C. Always.

https://www.shititong.cn/cha-kan/shiti/00051009-3390-6a0f-c0f1-a6c9d0d6c300.html
点击查看答案
The water valve and the flush valve are monitored by :

A. The Vacuum System Controller

B. The vacuum generator

C. The associated Flush Control Unit BITE

https://www.shititong.cn/cha-kan/shiti/00051009-32f8-1729-c0f1-a6c9d0d6c300.html
点击查看答案
When the APU fire pb is released out ,what happens to the electrical generation?

A. APU generator is de-energized.

B. APU generator is disconnected.

C. APU generator is energized.

https://www.shititong.cn/cha-kan/shiti/00051009-33bb-e6c8-c0f1-a6c9d0d6c300.html
点击查看答案
In flight, a class 2 failure has occurred. Now, we are on ground. Where is this failure displayed ?

A. Only on the ECAM STATUS page .

B. In the LAST LEG REPORT, the AVIONICS STATUS and the ECAM STATUS page .航后报告/航空电子设备状态和ECAM状态页

C. Class 2 failures are only displayed in flight.

https://www.shititong.cn/cha-kan/shiti/00051009-3344-9a63-c0f1-a6c9d0d6c300.html
点击查看答案
On ground, when does the vacuum generator start to operate ?

A. As soon as the aircraft is energized.

B. As soon as the flush switch is pressed in ,and only if the altitude pressure switch is closed.

C. As soon as the altitude pressure switch closes.

https://www.shititong.cn/cha-kan/shiti/00051009-32f4-25de-c0f1-a6c9d0d6c300.html
点击查看答案
The TCAS/ATC control panel controls :

A. ATC transponders and TCAS computer directly.

B. ATC transponders directly and TCAS computer through the ATC transponders.

C. TCAS computer directly and ATC transponders through the TCAS computer.

https://www.shititong.cn/cha-kan/shiti/00051009-3328-a622-c0f1-a6c9d0d6c300.html
点击查看答案
In which of the following configurations is the whole galley network shed when an overload occurs ?

A. In flight with two IDG supply.

B. ON ground with APU supply only.

C. ON ground with EXT PWR only.

https://www.shititong.cn/cha-kan/shiti/00051009-33ad-b291-c0f1-a6c9d0d6c300.html
点击查看答案
The static inverter operates

A. Permanently.

B. When on batteries only.

C. When one engine generator fails.

https://www.shititong.cn/cha-kan/shiti/00051009-339c-b39a-c0f1-a6c9d0d6c300.html
点击查看答案
Below 400 feet, during an ILS approach,the LAND active mode:

A. Can be de-activated by pressing the LOCp/b.

B. Can be de-activated by a GO-AROUND engagement.

C. Can be de-activated if the APPR pushbutton is pressed.

https://www.shititong.cn/cha-kan/shiti/00051009-33d0-b080-c0f1-a6c9d0d6c300.html
点击查看答案
试题通小程序
试题通app下载