61、Exhibit switch An administrator configures a distributed switch and adds the first VMware ESXi server to it.The administrator also performs the following activities:•The administrator assigns two uplinks to the distributed switch.•The administrator enables uplink teaming.When attempting to perform a health check of the teaming policy, the health status of the Teaming and Failover reports as ' Unknown?, as seen in the exhibit.What can the administrator changes in the distributed switch for the health status to report correctly
答案解析
相关题目
67、What are three options an administrator can configure after creating a vSphere Namespace? (Choose three)
66、After a recent unexplained peak in virtual machine (VM) CPU usage, an administrator is asked to monitor the VM performance for a recurrence of the issue.Which two tools can the administrator use? (Choose two)
65、An administrator is tasked with installing VMware vCenter. The vCenter Server Appliance must support an environment of: • 400 hosts • 4000 virtual machines Which two resources must be allocated, at a minimum, to meet the requirements? (Choose two)
64、An administrator is preparing for a deployment of a new vCenter Server Appliance. The following information has been provided to complete the deployment:•ESXi Host name (FQDN): esx0l.corp local . ESXi IP Address: 172.20.10.200 •vCenter Server Name (FQDN): vcsa01 corp.local •vCenter Server IP Address: 172.20 10.100 •NTP Server: 172.20.10.20 •DNS Server: 172.20.10.1 •Deployment Size: Tiny •Storage Size: Default Which two actions must the administrator complete before starting the installation of the vCenter Server Appliance? (Choose two.)
63、An administrator is working with VMware Support and Is asked to provide log bundles for the ESXI hosts in an environment.three options Joes the administrator have? (Choose three)
60、Which two datastore types store the components of a virtual machine as a set of objects? (Choose two)
52、A vSphere cluster has the following configuration: • Virtual machines (VMs) are running Production and Test workloads • vSphere Distributed Resource Scheduler (DRS) is enabled • There are no resource pools in the cluster Performance monitoring data shows that the Production workload VMs are not receiving their fully allocated memory when the vSphere cluster is fully utilized. A combination of which two steps could the administrator perform to ensure that the Production VMs are always guaranteed the full allocation of memory? (Choose two.)
51、An administrator is attempting to configure Storage I/O Control (SIOC) on five datastores within a vSphere environment. The administrator is being asked to determine why SIOC configuration completed successfully on only four of the datastores. What are two possible reasons why the configuration was not successful? (Choose two.)
50、A vSphere environment is experiencing intermittent short bursts of CPU contention, causing brief production outages for some of the virtual machines (VMs). To understand the cause of the issue, the administrator wants to observe near real-time statistics for all VMs.Which two vSphere reporting tools could the administrator use? (Choose two)
40、 
An administrator is tasked with adding new capacity to an existing software-defined data center (SDDC). • The SDDC currently hosts two vSphere clusters (ClusterA and ClusterB) with different CPU compatibilities. • vSphere vMotion and vSphere Distributed Resource Scheduler (DRS) are currently in use in the SDDC. • The new capacity will be implemented by provisioning four ESXi hosts running a new generation of Intel Skylake CPUs. • All workload virtual machines (VMs) must support live migration to any cluster in the SDDC. The administrator noticed the running critical 'ever virtual machine (VM) shown in the exhibit is not migrating using vSphere vMotion to the original Clusters A or B. Which three steps must the administrator take to support this functionality? (Choose three.)