47、An administrator decides to restore VMware vCenter from a file-based backup following a failed upgrade.Which interface should the administrator use to complete the restore?

A
 Direct Console User Interface (DCUI)
B
 vCenter Management Interface (VAMI)
C
 vSphere Client
D
 vCenter GUI Installer

答案解析

正确答案:D

解析:

解析:You can use the vCenter Server appliance GUI installer to restore a vCenter Server to an ESXi host or a vCenter Server instance. The restore procedure has two stages. The first stage deploys a new vCenter Server appliance. The second stage populates the newly deployed vCenter Server appliance with the data stored in the file-based backup.您可以使用vCenter Server appliance GUI安装程序将vCenter Server恢复到ESXi主机或vCenter Server实例。还原过程有两个阶段。第一阶段部署新的vCenter Server设备。第二阶段用基于文件的备份中存储的数据填充新部署的vCenter Server应用装置。
英文知识复习题库

扫码进入小程序
随时随地练习

相关题目

单选题

98、When configuring vCenter High Availability ( HA), which two statements are true regarding the active, passive, and witness nodes? ( Choose two)

单选题

97、Which two series of steps should the administrator perform to start the remediation of the cluster using the new image? ( Choose two)

单选题

94、What are two use cases for VMware vSphere+? ( Choose two)

单选题

92、Which four elements can a vSphere Lifecycle Manager image contain? (Choose four )

单选题

91、Which two tasks can be completed using vSphere LifeCycle Manager? (Choose two )

单选题

89、An administrator is tasked with allowing a single user the ability to take snapshots on a virtual machine. When looking in vCenter, the administrator can see that there are already users and groups assigned permissions on the virtual machine as follows:•The group VMUsers has the Virtual Machine Power User role.Microsoft Windows The administrator confirms that the user requesting the additional access is currently one of five members of the VM_Viewers group .Which two steps should the administrator take to grant this user the additional access required without impacting the user access of others? (Choose two)

单选题

85、administrator successfully installs VMware ESXi onto the first host of a new vSphere duster but makes no additional configuration changes. When attempting to log into the vSphere Host Client using the Fully Qualified Domain Name (FQDN) of the host, the administrator receives the following error message:server Not Found –we can’t connect to the server at esxit101.corp.local.’’• Host FQDN: esxi 101. Corp. local • Management VLAN ID: 10• DHCP: No • Management IP Address: 172.16.10.101/24 • Management IP Gateway: 172.16.10.1 • Corporate DNS Servers: 172.16.10.5, 172.16.10.6 • DNS Domain: corp.localWhich three high level tasks should the administrator complete, at a minimum, in order to successfully log into the the vSphsrs Host Client using the FQDN for the exxi101 and complete the configuration (Choose three)

单选题

73、An administrator is responsible for the management of a VMware vCenter instance that is currently experience performance issues. The administrator quickly identifies that the CPU and memory utilization of vCenter is consistently over 90%. Upon further analysis, it seems that the vpxd process is contributing significantly to the performance issue.(Choose four)

单选题

72、An administrator is tasked with implementing a backup solution capable of backing up the Supervisor cluster, vSphere Pods, and persistent volumes. Which two solutions must be used to meet this requirement? ( Choose two)

单选题

70、An administrator needs to configure a content library solution based on the following information: •A new corporate virtual machine (VM) template is created every month to include all of the latest patches. •The new VM template should be downloaded from the primary data center site (London) to two secondary data center sites (Tokyo and New York) as soon as possible. •There is limited disk space available at one of the secondary data center sites (Tokyo) due to an ongoing data center consolidation project. Which four steps should the administrator take to configure the content library solution before adding a VM template? (Choose four.)

关闭
专为自学备考人员打造
试题通
自助导入本地题库
试题通
多种刷题考试模式
试题通
本地离线答题搜题
试题通
扫码考试方便快捷
试题通
海量试题每日更新
试题通
欢迎登录试题通
可以使用以下方式扫码登陆
试题通
使用APP登录
试题通
使用微信登录
xiaochengxu
联系电话:
400-660-3606
xiaochengxu