AI智能整理导入 AI智能整理导入
×
首页 题库中心 英文知识复习题库 题目详情
CAD50ED3E1F00001E524114010671A39
英文知识复习题库
103
单选题

34、Refer to the exhibit.
After updating a predefined alarm on VMware vCenter, an administrator enables email notifications as shown in the attached alarm; however, notifications are NOT being sent. Where must the mail server settings be configured by the administrator to resolve this issue?

A
 In the ESXi host system config
B
 In the alarm rule definitions
C
 In the vCenter settings in the vSphere Client
D
 in the vCenter Management Interface

答案解析

正确答案:C

解析:

解析: Option C is correct because it allows the administrator to configure the mail server settings in the vCenter settings in the vSphere Client, which are required for sending email notifications for alarms. Option A is incorrect because it configures the mail server settings on an ESXi host system, which are not used for sending email notifications for alarms. Option B is incorrect because it configures the alarm rule definitions, which arealready enabled in the exhibit. Option D is incorrect because it configures the vCenter Management Interface, which is not used for sending email notifications for alarms. References:解释选项C是正确的,因为它允许管理员在vSphere Client的vCenter设置中配置邮件服务器设置,这是发送警报电子邮件通知所必需的。选项A不正确,因为它在ESXi主机系统上配置邮件服务器设置,这些设置不用于发送警报的电子邮件通知。选项B是不正确的,因为它配置了警报规则定义,这些定义在图中已经启用。选项D不正确,因为它配置vCenter管理界面,而该界面不用于发送警报电子邮件通知。
英文知识复习题库

扫码进入小程序
随时随地练习

相关题目

单选题

19、An administrator wants to create virtual machine ( VM) templates and store them in a content library. The administrator would like to use the content library to manage different versions of these templates so that reverting to an earlier version is an option.

单选题

17、An administrator is tasked with adding two additional hosts into an existing production vSphere cluster to support the need for additional capacity.The vSphere cluster currently has four identically configured ESXi hosts (esxOT esx02. esx03 and esx04) that utilize Intel Skylake-based CPUs. The two new hosts (esx05 and esx06) are configured identically in terms of memory and storage to the existing hosts: but utilize Intel Ice Lake-based CPUs.The administrator must ensure that:•Any virtual machine migrates to any of the six ESXi hosts running in the cluster. •There is no virtual machine downtime during the process of adding the new hosts.Which step should the administrator take to meet these requirements?

单选题

16、An administrator Is looking to deploy a new VMware vCenter Instance. The current environment consists of 75 hosts and is expected to grow up to 100 hosts over the next three years.Which deployment size should the administrator select?

单选题

15、An administrator is completing the configuration of a new vSphere cluster and has enabled vSphere High Availability ( HA) and vSphere Distributed Resource Scheduler ( DRS). After adding the ESXi hosts to the cluster, which networking information will the administrator be prompted to provide when using the Cluster Quickstart workflow?

单选题

13、Refer to the exhibit.An administrator set up the following configuration: • The distributed switch has three ESXi hosts, and each host has two 40 Gbps NICs.• The amount of bandwidth reserved for virtual machine (VM) traffic is 6 Gbps.The administrator wants to guarantee that VMs in the Finance distributed port group can access 50 percent of the available reserved bandwidth for VM traffic. k Given this scenario, what should the size (in Gbps) of the Finance network resource pool be?

单选题

12、Which step is completed during Stage 1 of the vCenter Server Appliance deployment?

单选题

11、An administrator is configuring vSphere Lifecycle Manager to install patches to a vSphere cluster. The cluster runs workload virtual machines (VMs) that are incompatible with vSphere vMotion, and therefore cannot be Which configuration in vSphere Lifecycle Manager will allow the administrator to reduce the downtime live migrated between hosts during the installation of the patches.associated with the patching operation without migrating the VMs?

单选题

9、An administrator needs to consolidate a number of physical servers by migrating the workloads to a software-defined data center solution.Which VMware solution should the administrator recommend?

单选题

6、During the staging of a patch on a vCenter Server Appliance, an error was encountered and the process stopped. An administrator resolved the root cause and is ready to continue with the staging of the patch. From the vCenter Management Interface, which action should the administrator take to continue the process from the point at which the error occurred?

单选题

5、An administrator is asked to segregate virtual machine (VM) traffic by VLAN on a vSphere standard switch The following requirements must be met: •VLAN ID on the switch port group must be 4095. •VLAN tagging must be done at the VM level.Which tagging mode is required?

关闭
专为自学备考人员打造
试题通
自助导入本地题库
试题通
多种刷题考试模式
试题通
本地离线答题搜题
试题通
扫码考试方便快捷
试题通
海量试题每日更新
试题通
欢迎登录试题通
可以使用以下方式扫码登陆
试题通
使用APP登录
试题通
使用微信登录
xiaochengxu
联系电话:
400-660-3606
xiaochengxu