相关题目
单选题
Make sure that the fluid that goes through the tube has no bubbles.
单选题
Make sure that the doors are closed during the pressurization test.
单选题
Make sure that there is tension in the lockwire.
单选题
The time between clicks must be 20 seconds.
单选题
Measure the time necessary for the pressure to decrease.
单选题
To install the indicator, tilt it rearward.
单选题
The tolerance is plus or minus 0.2 mm.
单选题
A number in the top left corner of the display refers to a related page.
单选题
The vertical stabilizer is installed on the top of the fuselage tail section.
单选题
Torque the plug to 6 Nm.
