It is under the tilte "Parking and Mooring" that the instructions necessary to park and moor the aircraft in any of the probable conditions to which it may be subjected.
答案解析
相关题目
For ease of reference, these tab dividers shall be staggered.
List these sections under each trouble in order of probability.
It shall be self-contained and may duplicate other tests.
Attach the ropes on the ground with the mooring points.
The crew controls the aircraft direction during push back with the steering wheel.
De-energize the aircraft electrical circuits.
Operate the jack slowly, until the NLG shock absorber is compressed.
The present Service Bulletin List is compiled at manual level.
To prevent heat damage to the slats, the ground test stop automatically after 30 seconds.
To make pin removal easier, manually turn the canopy in one direction and then in the other.
