AI智能整理导入 AI智能整理导入
×
首页 题库中心 (英译汉)英语。翻译。汉语 题目详情
CABA0CF6C9F00001B9F4413051401690
(英译汉)英语。翻译。汉语
1,776
单选题

The circuit breakers are installed on the rear of the unit.

A
跳开关安装在组件的前部。
B
跳开关位于组件侧面。
C
跳开关安装在组件的后部。

答案解析

正确答案:C
(英译汉)英语。翻译。汉语

扫码进入小程序
随时随地练习

相关题目

单选题

The manufacturer shall provide an equipment list in this Section, in a separate document appended to the Pilot's Operating Handbook, or as a separate document. If the equipment list is not contained in this Section, state its location.

单选题

In addition to the weight and balance loading form, the manufacturer may provide a device to be used to calculate weight and balance. Instructions for its use shall be provided.

单选题

A weight and balance loading form and an explanation of the calculation procedure shall be provided.

单选题

This paragraph describes the procedures to calculate weight and moment for various phases of a planned flight and to ensure that the center of gravity is within approved limits.

单选题

Explain how to maintain this record when changes to the weight or moments of the airplane are made so that accurate starting data is available to calculate the weight and C.G. during normal operation of the airplane.

单选题

INSPECTION PROCEDURE sets forth the inspection procedure(s) to be utilized, such as magnetic particle, visual, etc, and may reference another document for the actual procedure, such as a nondestructive testing manual.

单选题

A review of test results applicable to the design was made. The loading conditions together with the resulting margins of safety were evaluated. The resulting data were used to determine if the component should be considered for incorporation into the CAP.

单选题

The effects of corrosion have not been considered in the rationale in selecting inspection times or in the effects on the fatigue stresses. It is very difficult to determine the effects of corrosion but, as the reports from the CAP inspections are received, the inspection times will be adjusted for any severe problems.

单选题

High-time airplanes, disassembled for major overhaul, were inspected to assist in selecting inspection items. Other high-time airplanes’ special Continuing Airworthiness Program Inspection results supplement these inspections.

单选题

In addition to understanding FAA Advisory Circulars AC 91-60 and AC 91-56, familiarity with GAMA Specification No.2, Manufacturers Maintenance Data and Air Transport Association of America Specification No.100, Specification for Manufacturers Technical Data, will aid in the preparation of a CAP for a specific airplane.

关闭
专为自学备考人员打造
试题通
自助导入本地题库
试题通
多种刷题考试模式
试题通
本地离线答题搜题
试题通
扫码考试方便快捷
试题通
海量试题每日更新
试题通
欢迎登录试题通
可以使用以下方式扫码登陆
试题通
使用APP登录
试题通
使用微信登录
xiaochengxu
联系电话:
400-660-3606
xiaochengxu