多选题
装配式深化设计节点检查时,应充分考虑( )等施工措施的需求。
A
放线孔
B
传料孔
C
布料机
D
泵管孔
E
临水临电
答案解析
正确答案:ABCDE
解析:
装配式深化设计节点检查时,应充分考虑( )等施工措施的需求。 A.放线孔 B.传料孔 C.布料机 D.泵管孔 E.临水临电 答案:ABCDE
This question involves "装配式深化设计节点检查" (assembly-based detailed design node inspection), which refers to the inspection of specific construction nodes during the detailed design phase for assembly-type construction. The question asks about the considerations during this inspection. The correct answer, "ABCDE," indicates that all of the listed options, including "放线孔" (layout holes), "传料孔" (material transfer holes), "布料机" (rebar bending machine), "泵管孔" (pipe holes for pumping), and "临水临电" (near water and electricity), are necessary aspects to be taken into account during the inspection of assembly-based detailed design nodes.
Note: The above explanations are based on the given answer choices and the context provided in the questions.
相关题目
单选题
砌体班组对抹灰班组进行工作面及场地的移交应注意检查砌体垂直度控制在()mm内,平整度控制在()mm内
单选题
薄抹灰相比于普通抹灰垂直运输使用(),工期()
单选题
薄层抹灰灰层非常薄,水分散失快,所以要求有较高的保水率()和粘接强度,一般会对薄层抹灰的砂浆进行抗拉拔测试
单选题
薄抹灰工艺使用于使用()工艺的墙体
单选题
一般抹灰墙裙、勒脚上口直线度采用拉()线,不足()拉通线,用钢直尺检查检查
单选题
一般抹灰分隔条(缝)直线度采用拉()线,不足()拉通线,用钢直尺检查检查
单选题
针裂导致的抹灰开裂处理对砖墙裂缝()切割,深度砖墙(),并清理湿润
单选题
空鼓修补时,先在底面及四周刷()一遍,然后分两次用和原面层相同材料的水泥砂浆填补并槎平,及时养护7天
单选题
空鼓部分切割凿除范围为空鼓部位四周扩大()mm
单选题
当抹灰厚度大于50mm时,对超过50mm的部位植筋,钢筋应埋设牢固;抹灰分层施工,每次厚度均应≤()mm